[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-\u002Fblog\u002Fvertical-evidence-packs-land-data":3},{"id":4,"title":5,"author":6,"body":7,"category":164,"cover":165,"date":166,"description":167,"extension":168,"meta":169,"navigation":170,"path":171,"seo":172,"stem":173,"tags":174,"__hash__":181},"blog\u002Fblog\u002Fvertical-evidence-packs-land-data.md","Evidence Packs: Land Data Assembled for Eight Land Jobs in Western Canada","Township Canada",{"type":8,"value":9,"toc":155},"minimark",[10,14,22,27,30,33,37,46,49,52,60,64,70,76,82,88,94,100,106,112,115,119,122,126,147],[11,12,13],"p",{},"A pipeline integrity engineer gets a new corridor. Before planning a site visit, they want the outside picture along the line: which LSDs it crosses, which other pipelines it meets, where it crosses water, and which wells sit close to it. The integrity system holds the inspection and repair history, but none of that external context. Building it means looking up one legal location at a time across regulator and agriculture sources, then stitching the results into a table that someone else can check.",[11,15,16,17,21],{},"An ",[18,19,20],"strong",{},"evidence pack"," does that assembly for a specific job. You send the parcels or the corridor, and we return one set of files with the land and infrastructure record for each legal location, with the dataset, publisher and data date on every section. We built packs for eight professional disciplines, each with its own page and a real sample you can read before asking for anything.",[23,24,26],"h2",{"id":25},"what-an-evidence-pack-is","What an evidence pack is",[11,28,29],{},"A pack is built from the same data behind the Township Canada parcel report: AER and Saskatchewan well, pipeline and facility records, Crown tenure, the Productivity Score and soil capability, AAFC crop inventory and land use, the Canadian Drought Monitor, 1:50,000 hydrology and NRCan flood susceptibility. The difference is the shape. A parcel report answers questions about one quarter section in the app. A pack arranges the evidence the way a specific job reads it: one record per LSD in chainage order for a corridor, a subject-versus-comparables table for an appraisal, or a Found, Not found and Not covered checklist for a desktop screen.",[11,31,32],{},"Every pack arrives as JSON, CSV and GeoJSON for your own tools, plus a printable report for the file. Each one also says what it is not. A rural appraisal pack is not an appraisal, an environmental screening pack is not a Phase I environmental site assessment, and a pipeline pack is not an integrity assessment or a risk score. The pack supplies the evidence. The professional judgement stays with you.",[23,34,36],{"id":35},"a-real-sample-a-gas-line-across-the-red-deer-river-valley","A real sample: a gas line across the Red Deer River valley",[11,38,39,40,45],{},"The sample on the ",[41,42,44],"a",{"href":43},"\u002Findustries\u002Fpipeline-integrity","pipeline integrity page"," uses a public AER licence centreline as a stand-in: a gas line crossing the Red Deer River valley through Kneehill and Starland counties in Alberta. The pack was generated from production data on November 10, 2026, with a 100 m buffer.",[11,47,48],{},"The summary reads like this. The 32.6 km centreline touches 136 LSDs in 62 quarter sections. It has 42 crossing points with 40 other published pipeline segments and 18 mapped water crossings. Ten wells sit within 100 m of the line: 3 orphan, 4 abandoned and 1 reclaimed. Five facilities sit within the buffer.",[11,50,51],{},"Below the summary, the crossings table lists every point where another pipeline, a watercourse or a water body meets the centreline, by chainage. A pipeline crossing carries the licence and line number, licensee, substance, status and diameter where the AER publishes one. A line that ends on the centreline is listed as a tie-in rather than a crossing. The per-LSD records then give the metres of centreline inside each LSD, the wells, orphan wells and facilities in the buffer, the land-use class of the parent quarter section and the current drought class.",[11,53,54,55,59],{},"This is the part that usually takes the time. Each value comes from a public record, but the records sit in different places and use different identifiers. The pack reads them against the same survey grid, so a reviewer can trace any row back to its source. The ",[41,56,58],{"href":57},"\u002Findustries\u002Fpipeline-integrity\u002Fintegration","technical integration page"," documents the input and output shape for teams that want to load the records into an integrity or GIS platform.",[23,61,63],{"id":62},"the-eight-packs","The eight packs",[11,65,66,69],{},[18,67,68],{},"Pipeline integrity."," Send a centreline as GeoJSON and a buffer width. You get one record per intersected LSD with wells, facilities, pipeline and water crossings, land use and drought. You can list your own licence numbers so your line is not counted as a crossing.",[11,71,72,75],{},[18,73,74],{},"Utilities and rights of way."," Built on the same corridor engine for an electric, telecom or water alignment. It returns one row per quarter section crossed, with an indicative right-of-way footprint at an assumed width, land use, dominant crop, Productivity Score, and pipeline and water crossings.",[11,77,78,81],{},[18,79,80],{},"Rural appraisal."," Send a subject quarter section and a few comparables. The pack lines them up in one table: acres, Productivity Score, capability, soil, crop history, drought, water, wetlands, flood susceptibility and energy infrastructure. It has no sales data and gives no opinion of value.",[11,83,84,87],{},[18,85,86],{},"Surface rights."," One quarter section or LSD per pack: wells, pipelines with metres on the parcel, facilities, Crown petroleum and natural gas and mineral tenure, and the productivity of the affected land. It adds an indicative pipeline right-of-way footprint, which is a scoping number and not the registered plan.",[11,89,90,93],{},[18,91,92],{},"Environmental screening."," A desktop screen of what the public record shows on a parcel and within a 500 m ring, as a checklist. Spills, contaminated sites, storage tanks, historical air photos and protected areas are not loaded, so they read Not covered instead of looking clean.",[11,95,96,99],{},[18,97,98],{},"Energy liability."," Wells on the parcel and within 500 m by status, orphan inventory matches, facilities, pipeline and production context and, in Alberta, whether each licensee still reports active wells. It does not estimate closure or reclamation cost.",[11,101,102,105],{},[18,103,104],{},"Farmland investment."," Up to 25 quarter sections or LSDs in one comparison table: Productivity Score, dominant crop, cropland share, drought history, wells, pipeline metres and wetlands, with acre-weighted totals for the portfolio.",[11,107,108,111],{},[18,109,110],{},"Ag lending and crop insurance."," A profile for each parcel on a loan or policy file, up to 25 per pack, with productivity, crop history, drought history, soil and energy infrastructure, and flags for what stands out. This one is still a prototype, and the credit or insurance decision stays with your underwriter.",[11,113,114],{},"A ninth sample sits on the surveying industry page: a survey research pack for one legal location. It is not a legal survey, and its parcel polygons do not replace a plan or a monument search.",[23,116,118],{"id":117},"coverage-and-limits","Coverage and limits",[11,120,121],{},"Packs read DLS quarter sections and LSDs in Alberta, Saskatchewan and Manitoba. Corridors must run through the DLS grid, so British Columbia NTS areas are not supported yet. Pipelines and facilities cover Alberta and Saskatchewan, and Manitoba parcels report wells only. The Productivity Score uses the LSRS soil rating in Alberta and a national soil fallback in Saskatchewan and Manitoba, so compare scores within a province. There are no road or railway layers in the engine, so a corridor pack reports no road or rail crossings. Each pack lists the gaps that apply to it under \"Not included or not covered\".",[23,123,125],{"id":124},"how-to-request-a-pack-for-your-own-parcels","How to request a pack for your own parcels",[11,127,128,129,133,134,137,138,142,143,146],{},"Packs run as pilots. Open the page for your discipline from ",[41,130,132],{"href":131},"\u002Findustries","Industries",", read the sample, and select ",[18,135,136],{},"Request a sample pack",". It opens the ",[41,139,141],{"href":140},"\u002Fcontact-us?topic=pilot","contact form"," with ",[18,144,145],{},"Evidence packs"," selected and the pack named. Send a handful of legal land descriptions, or the corridor as a GeoJSON line, and say what you would use the pack for. We run it and send back the files.",[11,148,149,150,154],{},"There is no self-serve upload and no published price for packs yet. If you need the same land and energy data inside the app today, the Agriculture and Energy add-ons put it on every parcel report, and ",[41,151,153],{"href":152},"\u002Fpricing","pricing"," lists both.",{"title":156,"searchDepth":157,"depth":157,"links":158},"",2,[159,160,161,162,163],{"id":25,"depth":157,"text":26},{"id":35,"depth":157,"text":36},{"id":62,"depth":157,"text":63},{"id":117,"depth":157,"text":118},{"id":124,"depth":157,"text":125},"product",null,"2026-11-16","Evidence packs bundle wells, pipelines, tenure, soil, crops, drought and water for your parcels or corridor, with the source and date on every section.","md",{},true,"\u002Fblog\u002Fvertical-evidence-packs-land-data",{"title":5,"description":167},"blog\u002Fvertical-evidence-packs-land-data",[175,176,177,178,179,180],"Evidence Packs","Pipeline Integrity","Rural Appraisal","Energy Bundle","Agriculture Bundle","Product Launch","ZixNT15Ifgfrya1Q6FoyypK8jFSCAAkVsx_NdYjPRrM"]